Release date:2026-11-06 Browse:
Wuxi Huatian’s Self-Designed Gas Turbine Test bed: A Milestone for China’s Private Power Innovation
In the rapidly evolving industrial energy landscape, reliable gas turbine technology serves as the cornerstone for efficient and sustainable power generation. Huatian Gas Turbine launched a domestically developed full-range long-term test bed for small industrial gas turbines in 2024. This breakthrough highlights the growing strength of technological innovation within China’s private sector.
What is the necessity of gas turbine testing? For instance, if blade cracking occurs in an aero-engine or gas turbine during operation, the gas turbine supplier must develop a maintenance plan or impose strict service life restrictions based on the crack location, length, load spectrum, and other parameters. This ensures no unstable crack propagation within the specified service life. Such processes rely on damage tolerance design evaluation methods and test databases. Only through design, analysis, and extensive component and full-engine testing can experience and specifications for damage tolerance design be accumulated, further guiding the formulation of gas turbine maintenance and repair schemes. This is also one reason for the high technical barriers in gas turbine overhaul and repair.

Another example is that, As the inlet gas temperature of gas turbines increases or the hydrogen blend ratio rises, issues relating to the structure, materials, emissions, aeroacoustic vibrations, backfiring and corrosion of the combustion chamber—a key component of the gas turbine—become increasingly prominent. Simulation has its limitations in addressing these issues; therefore, to enhance the testing capabilities for combustion chamber components and the integrated testing of the entire unit, it is necessary to conduct combustion tests at various scales and to continuously refine and improve the detailed design. All of this requires the support of a gas turbine test rig.
This advanced test bed is independently designed and built by Huatian, tailored specifically for the company’s HGT-2 (Qingniao) 2MW industrial gas turbine. As a self-developed model, the successful development and testing of HGT-2 mark Huatian’s achievement of full-process independent design capabilities for the three core components: compressor, combustor, and aturbine. It also possesses fully independent intellectual property rights, as well as independent complete machine design and engineering verification capabilities.

The test bed integrates more than a dozen systems, including fuel supply, intake and exhaust, electrical control, lubricating oil, load testing, and fire protection. Huatian’s comprehensive testing capabilities cover static commissioning, system integration testing, full-speed no-load and full-load testing, as well as special tests such as load sudden change and overspeed protection. The HGT-2 turbine has accumulated over 3,0000 equivalent operating hours (EOH), a key indicator for evaluating long-term reliability.
The test bed also adopts cutting-edge testing technologies, enabling parameter measurement under the "three high" operating conditions of gas turbines: pressure exceeding 4,000kPa, temperature up to 2,000℃, and speed exceeding 600m/s. With a 2mm 3D aerodynamic probe and temperature measurement accuracy of ±15℃, Huatian’s testing capabilities are on par with international standards.
In an industry driven by technology, Huatian’s test bed is more than a technical achievement—it is proof of the power of private innovation in advancing the energy transition. By combining practicality, cost-effectiveness, and openness, Huatian is not only enhancing its own capabilities but also contributing to the global development of industrial gas turbine technology.