Home/Case/News & Events

HGT-2 2 MW Class Gas Turbine: Programme Status

Release date:2026-09-16    Browse:

HGT-2 2 MW Class Gas Turbine: Programme Status

Full-machine durability validation complete, fleet operation past 30,000 hours, EPA emissions testing in progress

WUXI, China — Huatian Gas Turbine has published the current status of its HGT-2 2 MW class industrial gas turbine.

Stage

Status

Independent design of core components

Complete — compressor, combustor and turbine in house

Full-machine and accelerated durability testing

Complete on the company’s own test bed

Commercial deployment readiness

Confirmed by test

Field operation

In service — fleet operation past 30,000 hours

Project awards

Six units, offshore associated gas utilisation

High-H₂S combustor adaptation

Complete

EPA emissions testing (North America)

In progress

First shipment to a North American site

Schedule not yet published

The HGT-2 test bed — designed and built in house, and Jiangsu Province’s first self-integrated long-duration platform for small industrial gas turbines — applied 2 mm aerodynamic probes rated to 1,000 °C, thermometry continuous to 1,800 °C, combustion thermo-acoustic monitoring, thermal-paint blade surface mapping, online surge and stall prediction, and equivalent-operating-hours life assessment.
Key hardware: a two-stage titanium centrifugal compressor at pressure ratio 9.6 and adiabatic efficiency 0.81; a 160 kg three-stage axial turbine in nickel-based superalloy with hollow internally cooled first-stage blades; a 130 kg single can combustor removable for inspection without disassembling the engine, which also opens a borescope path into the turbine; and a fully self-developed control system on a triple-modular-redundant fault-tolerant PLC with independent intellectual property rights.
Packaged for distributed duty the unit delivers 2 MW on pipeline gas with NOx ≤25 ppm, a 35,000-hour maintenance interval, target annual operation above 8,000 hours, and waste heat driving absorption cooling to a PUE target of 1.2 or below.


 

Media Contact
Marketing & Communications, Wuxi Huatian Gas Turbine Co., Ltd.
[hyturbines@ihuatian.com] · [+86 400-823-6768]