Release date:2026-05-28 Browse:
RB211-24G Hot Section Overhaul
Hot-section inspection and coating restoration following prolonged high-load operation
At 25,000 operating hours, the RB211-24G was disassembled and inspected to determine component condition and define the repair scope. Inspection found varying degrees of thermal-barrier-coating loss on combustor flame tubes and first-stage turbine rotor and stator blades after prolonged high-load operation. The affected coatings were removed and reapplied, and the components were inspected against the approved criteria for the next maintenance interval.


Media Contact
Marketing & Communications, Wuxi Huatian Gas Turbine Co., Ltd.
[hyturbines@ihuatian.com] · [+86 400-823-6768]